Cloud-electronics PS16 User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
Pump Station 16-R: Installation and operation manual 3
4 Schematic Diagram
Pump Station 16-R & Sub Station 16-R
5 Installation
The Cloud Pump Station 16-R is suitable for mounting in a standard 19” equipment rack where
it will occupy two units of rack space. The Pump Station 16-R is 170mm deep, but a depth of
235mm should be allowed to clear the rear panel connectors. When possible, avoid positioning
the unit in close proximity to magnetic fields or equipment operating at a high temperature. The
Pump Station 16-R operates from an external plug-top transformer and a provision should be
made to plug this into a suitably positioned power socket. The Pump Station 16-R is fitted with
an RJ45 socket for each remote control unit; terminate using eight core category 5 cable (4 pair
Cat 5). The total cable length from an RH-8 to the rack should not exceed 100m (328ft).
6 RH-8 Installation
When installing the RH-8 we suggest that an RJ45 data socket is
floor mounted adjacent to each one. Wire each data socket
individually back to the equipment rack pin to pin using CAT 5
cable. The RH-8 is fitted with an RJ45 compatible data socket
and supplied with a 3m patch cord to link to the floor mounted
data socket; this approach simplifies maintenance.
Cable Information for Wiring the RH-8 to a Floor Socket
RH-8 (RJ45) Pump Station 16-R (RJ45) CAT 5*
Pin 8 Pin 8 Brown/White
Pin 7 Pin 7 White/Brown
Pin 6 Pin 6 Green/White
Pin 5 Pin 5 White/Blue
Pin 4 Pin 4 Blue/White
Pin 3 Pin 3 White/Green
Pin 2 Pin 2 Orange/White
Pin 1 Pin 1 White/Orange
16-07-02 V2.1
Page view 3
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments